Key projects we've worked on:
![](/media/jw5pjgsb/terminal-5-heathrow-2.jpg)
Terminal 5 - Heathrow
Brief:
Unloading box wagons of aggregate, placing to stockpiles and reloading to road lorries.
Read More
|
![](/media/qgtgg3jz/hanson.jpg)
Hanson Aggregates
Brief:
Rock armour logistics & handling utilising rail wagons on project site logistics and handling.
Read More
|
![](/media/1stnsxd0/aggregate-industries.png)
AGGREGATE INDUSTRIES
Brief:
Unloading and handling of Gabion stone Parkstone Quay, Harwich Essex for use within local infrastructure projects.
Read More
|
![](/media/txtczcq1/image-2.jpg)
Crossrail C300/410
Brief:
Stockpiling and loading tunnel spoil onto rail box wagons for shipping to a land reclamation project.
Read More
|
![](/media/mrineczo/ctrl-image-1.jpg)
Channel Tunnel Link
Brief:
Unloading of box wagons into 9m high hopper
Read More
|
![](/media/onydwfmd/oldcastle-austin-texas-image-2.jpg)
Old Castle (CRH) Austin, Texas
Brief:
At Oldcastle there was a RUMig3 installed there at the Texas Location.
Read More
|
![](/media/v5tceuip/cemex.jpg)
Cemex - Multiple Locations
Brief:
Unloading & handling of aggregates and construction spoil from trains, haulage and earthworks for quarry restoration.
Read More
|
![](/media/fktmkyjw/kinder-morgan-image-small.jpg)
Kinder Morgan
Brief:
Kinder Morgan Fairless Hills Terminal This terminal is located on the Delaware River in Fairless Hills, Pennsylvania.
Read More
|
![](/media/1imhmbhl/carey-civil-engineering-battersea-power-station-redevelopment-image-1.jpg)
Battersea Power Station Redevelopment Project
Brief:
Battersea Power Station is being redeveloped as part of a seven-phased, £8bn worth redevelopment project.
Read More
|
![](/media/22ondbix/aggregate-industries-dp-world-image-1.jpg)
Aggregate Industries DP World
Brief:
Carrying out large volumes of material handling within DP World Thames Gateway Port.
Read More
|
![](/media/wf3oijmr/thames-tideway-tunnel-image-2.jpg)
Thames Tideway Tunnel
Brief:
Creating a new sewage tunnel system to allow the Thames Water to be cleaner avoiding overflow.
Read More
|
![](/media/hoqmvfaj/image-10.jpg)
Tarmac (CRH) - Multiple Locations
Brief:
Rail loading and unloading of aggregates and loading to customer's logistics.
Read More
|
![](/media/lv0nimx3/image-11.jpg)
Aggregate Industries (Lafarge HOLCIM)
Brief:
Operation of rail terminal including full terminal management and rail wagon unloading.
Read More
|
![](/media/0manl5bh/image-12.jpg)
Cemex - Multiple Locations
Brief:
Unloading construction spoil from trains, haulage and earthworks for quarry restoration.
Read More
|
![](/media/rnjlh42j/2012-olympic-site-east-london-image-1.jpg)
London 2012 Olympics
Brief:
Unloading and loading of aggregates to supply the Olympic Park construction site and associated concrete plants.
Read More
|
![](/media/e5ah4mvl/second-severn-crossing-image-1.jpg)
Second Severn Crossing
Brief:
The Second Severn Crossing is a cable-stayed bridge, with its total length being 5,128 metres.
Read More
|
![](/media/lxmasv51/manchester-airport-image-2.jpg)
Manchester Airport
Brief:
The new installed 26 metre pier will be used by all airlines currently operating out of terminal 2.
Read More
|
![](/media/kntjj5pw/aggregate-industries-plymouth.jpg)
Aggregate Industries Plymouth
Brief:
RFS were engaged to undertake earthworks for the on-going development of the Moorcroft Quarry
Read More
|
![](/media/wvpa00y4/aggregate-industries-gloucestershire.jpg)
Aggregate Industries Gloucestershire
Brief:
RFS were engaged to undertake earthworks for the on-going development of the Kempsford Quarry
Read More
|
![](/media/ndrjjluh/aggregate-industried-yeoman-glansanda2.jpg)
Aggregate Industries Yeoman Glensanda
Brief:
Our Equipment Solutions team were tasked to supply a range of heavy mobile equipment to carry out a variety of works within the quarry
Read More
|
![](/media/cntj4swu/leighton-buzzard-image-1.jpg)
Aggregate Industries Leighton Buzzard
Brief:
Stripping top soils and OB (clay) with excavators loading to ADT`s, hauling and placing within the quarry lakes restoration works.
Read More
|
![](/media/fa1anroz/glensanda-image-1.jpg)
Aggregate Industries Glensanda
Brief:
Stripping OB (Peat) with excavators loading to ADT`s, hauling and placing within the quarry restoration works.
Read More
|
![](/media/e10b3355/forterra-building-products-image-2.jpg)
DB Cargo - Forterra Building Products
Brief:
Provision of loading, unloading and road logistics services for DB Cargo UK / Forterra Building Products
Read More
|
![](/media/q2npx0fo/tata-steel.jpg)
DB Cargo - Tata Steel, Port Talbot
Brief:
Transportation, storage and delivery of hydrated lime, coal and coke to the steel works.
Read More
|
![](/media/okhlmv1d/uttoxeter-quarry-ob-stripping-restoration-bulk-technical-earthworks-image-1.jpg)
Uttoxeter Quarry OB Stripping & Restoration
Brief:
Stripping top soils and OB (clay) with excavators loading to ADT`s, hauling and placing within the quarry lakes restoration works.
Read More
|
![](/media/d3tfbfwz/bury-st-edmunds-brandon-norwich-sugarstone-material-handling-rail-image-1-png.jpg)
Bury St Edmunds, Brandon, Norwich Sugarstone
Brief:
Unloading of box wagons to stockpiles and reloading to road haulage for delivery to sugar beet factories.
Read More
|