Client Channel Tunnel Rail Link (CTRL)
Date 2004
Volume 90,000 tonnes of Granite Aggregates
Unloading of box wagons into 9m high hopper

Very strict time schedule adherence required, along with non-contamination of single sized material for stringent project compliance.

Operated and maintained conveyor discharge system which transfered materials to selected off loading stockpile bays, loading shovels supplied along with fully trained & certified operators, working 20hr 6day shifts to provide continuous feed to the segment plant.